Eiffel Tower, Construction, Workers, Engineers, France by PublicDomainArchive from CCO
The restrooms at Eli M. Oboler on the 2nd and 3rd floors are currently being remodeled. The construction should be completed by July 20. Meanwhile, although plastic sheeting is draped here and there, the library’s collections should be accessible. If you can’t find what you need, please ask for assistance at the Circulation / Reference desk on the 1st floor.
We apologize for the inconvenience.
0 Comments.